How is the landing field for aircrafts implemented?
STAGE 1
Performed a range of engineering surveys

Performed a range of engineering surveys following SP 47.13330.2012 "Engineering surveys for construction" including the following surveys:

  • Engineering and geodesic;
  • Engineering and geological;
  • Engineering and environmental;
  • Engineering and hydrometeorological.
STAGE 2
Developed a set of design documents

Based on the engineering surveys, we developed a set of design documents in compliance with the requirements of the Government Decree No. 87.

Developed estimates to assess the estimated cost of construction.

STAGE 3
Received a positive conclusion from the expert review of the design documentation

The engineering survey reports and design documentation are sent for expert review, where we and the client obtain approval of all our decisions and a positive expert opinion.

In addition, the expert appraisal assesses the reliability of the estimated cost of construction.

STAGE 4
Obtained a building permit for the facility

Following the requirements of the Order of the Federal Agency for Air Transport No. 260-P dated March 4, 2020, we prepared the required set of documents for the application to the Interregional Territorial Directorate of the Federal Agency for Air Transport, defended the decisions and obtained a construction permit for the facility.

STAGE 5
Developed a set of detailed design documentation

Detailed design solutions, final bill of quantities, purchase specifications for materials and equipment.

STAGE 6
Performed the supply of equipment

Technical equipment has been procured well in advance, allowing construction and installation works to begin without delay.

STAGE 7
Facility construction

The construction of the facility takes about 1 month.

Upon completion of construction and installation works, pre-commissioning works, acceptance tests were performed.

STAGE 8
We performed works to commission the facility

As part of the works:

- In accordance with the requirements of the Order of the Ministry of Transport of the Russian Federation No. 1 of 18 January 2005 and the Order of the Ministry of Transport of the Russian Federation No. 297 of 20 October 2014. We performed ground and flight checks of the process equipment;

- In accordance with the requirements of Order No.449 of the Ministry of Transport of the Russian Federation of 05 November 2020 We carried out the survey of high altitude obstacles within a radius of 60 km from the landing field;

- We developed and registered Aeronautical Landing Field Certificate, Transport Safety Passport. In accordance with the requirements of Order No.449 of the Ministry of Transport of the Russian Federation dated 05 November 2020 and requirements of Government Decree No.2090 of 29 November 2021.

STAGE 9
Obtained a permit to commission the landing field for aircrafts

In accordance with the requirements of Order of the Federal Agency for Air Transport No. 260-P of 04 March 2020.

We drew up the required set of documents for the application to the Ministry of Transport of the Federal Antimonopoly Service, secured solutions and obtained the permit to commission the facility.

STAGE 10
We notified the Interregional Territorial Directorate of the Federal Agency for Air Transport of the commencement of activities

In accordance with the requirements of the Order of the Ministry of Transport of the Russian Federation No. 250 dated 19 August 2015, we sent a notification to the Interregional Territorial Directorate of the Federal Agency for Air Transport about the start of activities at the landing field and received the officially commissioned landing field for aircrafts.

Other solutions

Airfields and landing fields for aircrafts maintenance

The whole complex of services from concept to commissioning from 12 000 $.

Learn more
Airfields and landing fields for aircrafts repairs

The whole complex of services from concept to commissioning from 20 000 $.

Learn more
Landing Field Transport Safety Data Sheet

Development of Transport Safety Data Sheet from 7 000 $.

Learn more
Landing Field Aeronautical Certificate

Development of the Aeronautical Landing Field Certificate from 20 000 $.

Learn more
Light-signalling equipment

The whole complex of services from concept to commissioning from 20 000 $.

Learn more
Radio equipment

The whole complex of services from concept to commissioning from 100 000 $.

Learn more
Meteorological equipment

The whole complex of meteorological equipment supply from 340 000 $.

Learn more